AIM:FMET | OTCQB:FULMF | FSE:J2M

Transforming mine waste into gold and critical minerals

Building a scalable, North American cyanide-free, mine-waste recovery platform.

Exterior of Fulcrum’s pilot facility in Mississauga, Ontario.

Pilot facility · Mississauga, Ontario

A pilot facility to advance metal recovery from legacy mine waste

Fulcrum is establishing a standalone, multi-project pilot facility to test Extrakt's cyanide-free technology, generate data to assess economics and guide engineering, permitting and financing — and recover precious and critical minerals from mine waste.

Partners Extrakt and TDI Location Mississauga pilot facility, Greater Toronto Area First programme Teck-Hughes project
12,526 square-foot leased facility
2.4 t/day maximum design capacity
~600 kg planned batch size
Teck-Hughes first planned programme

Capacity, batch size and timing are targets and remain subject to commissioning and programme requirements.

Recovering more. Wasting less.

Selected maximum laboratory recoveries across precious, base and strategic metals.

Precious metals
Base metals
Strategic metals

* Teck-Hughes Phase 3 laboratory results; maximum extractions from separate tests. Water and reagent recycling was simulated. Subject to pilot verification.

~6 hours Laboratory leach cycle
~80% Water and reagent recovery for reuse*
<1 minute Laboratory dewatering
Explore the laboratory results

The starting point

Kirkland Lake, Ontario

Our pilot facility provides a pathway to advance Teck-Hughes, followed by Sylvanite, towards commercial metal recovery.

Teck-Hughes
Teck-Hughes tailings project in the Kirkland Lake area
Sylvanite
Sylvanite tailings project in the Kirkland Lake area

Teck-Hughes

Fulcrum owns 100% of the mining rights to Teck-Hughes. Laboratory testing on its legacy gold mine tailings has demonstrated multi-metal extraction, supporting its selection for our first pilot programme.

Explore Teck-Hughes

Sylvanite

Fulcrum holds an option to acquire 100% of Sylvanite. This neighbouring legacy gold tailings project offers potential to apply learning from Teck-Hughes and support a combined Kirkland Lake development.

Explore Sylvanite
~10.7 Mt Combined legacy tailings estimates at the two projects
~3 km Between Teck-Hughes and Sylvanite, with potential hub synergies
70+ Documented legacy mine-waste sites across the Kirkland Lake and Timmins districts

A platform for growth

One platform. Multiple opportunities.

Reusable infrastructure

Evaluate before committing capital

Our reusable pilot infrastructure is designed to shorten development timelines, lower evaluation costs and reduce investment risk before commercial-scale deployment.

Exclusive regional rights

A foundation for expansion

Fulcrum holds exclusive rights to deploy Extrakt’s technology on legacy gold mine waste in Timmins and Kirkland Lake. Our review of the CIM tailings map identified 70+ legacy sites across these districts.*

70+ legacy sites across these districts identified in Fulcrum’s review of the CIM tailings map*

Project pipeline

Build beyond our first assets

Apply our pilot infrastructure and experience to further opportunities through acquisitions, partnerships and joint ventures.

Latest from Fulcrum

Follow Fulcrum Metals move to commercial deployment

Sign up for e-mail updates and stay up-to-date with the latest company news and information:

SUBSCRIBE NOW