Teck-Hughes
6.5MT
@ 0.66 g/t Au
historic estimates
Ownership: 100% owned
Total NSR: 4.5%
Buybacks: 3%/C$3.75M
AIM:FMET | OTCQB:FULMF | FSE:J2M
A scalable, North American cyanide-free, mine-waste recovery platform.
The opportunity
Legacy mine waste is already mined, already at surface and can contain billions of dollars worth of valuable metals. Advances in processing, stronger mineral demand and growing environmental expectations are creating opportunities to recover that value and support mine-site regeneration.
From lab to pilot
A standalone facility to advance metal recovery from historic mine waste
Fit out and commissioning underway
up to 2.4tpd capacity
c.600kg batches
Location: Mississauga, Greater Toronto
Initial recovery data
Integrated recovery performance
Operations, data, repeatability
Engineering and economic inputs
Build and operate; Joint Ventures; Paid testwork; Equity/royalty interest
Why an established, modular facility matters
Fulcrum combines project ownership, reusable pilot validation and exclusive regional rights to deploy Extrakt’s cyanide-free technology in precious and critical metal recovery from mine waste.
The first projects prove the model. The platform creates scale.
Reduce project-specific pilot builds. Save development time and cost.
Configure equipment for different feeds. Adapt flowsheets to different recovery objectives.
Evaluate projects for commercial deployment. Support engineering, scale-up, permitting and financing.
Advance Teck-Hughes and Sylvanite. Build pipeline through partnerships and joint ventures.
Teck-Hughes • Sylvanite • Building the Kirkland Lake foundation
Teck-Hughes and Sylvanite are legacy tailings from former gold mines in Ontario’s historic Kirkland Lake camp.
Around 3 km apart, they give Fulcrum two initial projects for testing cyanide-free recovery of gold and other metals from mine waste. Historical records estimate a combined 10.7 million tonnes of tailings; Fulcrum has not yet verified this estimate.
6.5MT
@ 0.66 g/t Au
historic estimates
Ownership: 100% owned
Total NSR: 4.5%
Buybacks: 3%/C$3.75M
4.2MT
@ 0.47 g/t Au
historic estimates
Ownership: 100% option
Total NSR: 1.5%
Buybacks: 0.75%/C$500k
Less than 3 km between the two projects.
~205koz combined historic conceptual gold estimate*
* To be verified by Fulcrum Metals. Project outlines are indicative.
Satellite imagery: Esri / Vantor. © 2026 Esri and its licensors. Sources: Esri, Vantor, Earthstar Geographics, GIS User Community. Project outlines: supplied map / Fulcrum Metals.
Global opportunity
282
Billion
tonnes
estimated accumulated
mine waste*
An estimated 282 billion tonnes of mine tailings have accumulated worldwide.
$3.4 Trillion
estimated recoverable
value*
Global mine tailings could contain up to $3.4 trillion in recoverable metals.
* “Copper and cobalt recovery from flotation tailings” — InnovEco Australia; University of South Australia; COOE.
Images are illustrative.
Date range
Sort by
Latest from Fulcrum
Sign up for e-mail updates and stay up-to-date with the latest company news and information:
SUBSCRIBE NOW